• Language:
  • NO
    Selected
  • GB
    Selected
  • GER
    Selected
  • BRA
    Selected
  • PL
    Selected
  • RU
    Selected
  • NO
  • GB
  • GER
  • BRA
  • PL
  • PL
en
In every corner of the world, there are Parat Halvorsen steam and heat systems in use every day. Quality and reliability have brought us where we are today.
  • NO
  • GB
  • GER
  • BRA
  • PL
  • You are here:
  • News
  • New order to deliver complete steam system for Eastern Shipbuilding NB 177
 
14.08.2018

New order to deliver complete steam system for Eastern Shipbuilding NB 177

The Steam System will be used for the trawlers processing plants. We will also deliver complete hot water systems for the domestic heating.

PARAT to deliver complete steam system for Eastern Shipbuilding NB 177
ST-115 Freezer Trawler design by Skipsteknisk. (Photo: Skipsteknisk)


Steam will be delivered by our 9 tons MCS Combined Steam Boiler utilizing the exhaust heat, the boiler is equipped with a rotary cup burner designed to use excess fish oil as a substitute to marine diesel if available. The system will be delivered with Feed water tank, pumps and excess stem dumping system. All controlled by PARAT designed PLC system.

The Hot Water System will be heated by Heat Recovery, Steam or Electricity and the potable water tank to be heated by the hot water loop.

Eastern Shipbuilding in Panama City, US will build this factory trawlers managed by Glacier Fish Company LLC, US, all design by Skipsteknisk AS of the design type ST-115.


PARAT to deliver complete steam system for Eastern Shipbuilding NB 177 PARAT to deliver complete steam system for Eastern Shipbuilding NB 177


Meet us here in 2018:

Nor-Fishing (Trondheim, Norway) Hall: T. Stand: 185 - 21-24 August 2018
SMM (Hamburg, Germany) Hall: B7, Stand: tba - 4-7 September 2018

Let us know if you want to setup a meeting, contact us for details.

 
More Information:
Reidar Frisell
Senior Sales Engineer
ref@parat.no
+47 99 48 55 27
PARAT MCS
Combined Oil Fired and Exhaust Gas Boiler