Platform Supply Vessel (PSV)
The scope of supply included the PARAT Electrical Steam Boiler System with a steam capacity of 2400 kg/h @ 7 barg, complete with effect and control panel, all assembled on a common skid. To meet the NOFO 2005 requirements the package also included complete steam distribution system for ORO mobilization.
The Parat multi nozzle system is a key component in this distribution system that ensures a robust, efficient and safe conversion of the onboard tanks for crude oil transportation in the case of a distastrous oil leakage at sea.
FJELLSTRAND YARD HOMEPAGE