ORO Plant Delivered to Fjellstrand Yard
15. Oct 2009

ORO Plant Delivered to Fjellstrand Yard

Parat was awarded the contract to supply the complete ORO system for Fjellstrand Yard no. 1684.



ORO Plant Delivered to Fjellstrand Yard

Parat delivered the complete ORO system for Fjellstrand Yard no. 1684, Electrical Steam Boiler
Platform Supply Vessel (PSV)


The scope of supply included the PARAT Electrical Steam Boiler System with a steam capacity of 2400 kg/h @ 7 barg, complete with effect and control panel, all assembled on a common skid. To meet the NOFO 2005 requirements the package also included complete steam distribution system for ORO mobilization.

The Parat multi nozzle system is a key component in this distribution system that ensures a robust, efficient and safe conversion of the onboard tanks for crude oil transportation in the case of a distastrous oil leakage at sea.

FJELLSTRAND YARD HOMEPAGE

More Information

PARAT MEL

Download datasheet
pdf

PARAT ORO

Download datasheet
pdf

Marine Boilers

Download datasheet
pdf



Meet us: All-Energy 15. - 16. May 2024 in Glasgow, Scotland
Meet us: Energia 22. - 24. October 2024 in Tampere, Finland

Uutiset

News archive