Installation of the Electrode Boiler at A2A started
15. Nov 2017

Installation of the Electrode Boiler at A2A started

The PARAT Electrode boiler arrived safely in Milan for installation at the A2A District Heating Plant.



Installation of the Electrode Boiler at A2A started

PARAT Halvorsen delivers Electrode Boiler to A2A, Italy

The 10MW High Voltage Electrode Hot Water Boiler arrived at the impressive District Heating facilities at A2A. The boiler was lifted in place through the top of the building and is now ready for installation.

This project is going according to plan and the boiler will start-up at the end of january 2018, used for peak load and grid regulation at this plant.

PARAT Halvorsen delivers Electrode Boiler to A2A, Italy PARAT Halvorsen delivers Electrode Boiler to A2A, Italy

(Photos by A2A)


Calore E Servizi Col

Meet us here in 2018:

E-World Energy & Water (Essen, Germany) Hall: 3, Stand: 3-161 - 6-8 February 2018
All-Energy (Glasgow, Scotland) Stand: L50 - 2-3 May 2018

Let us know if you want to setup a meeting, contact us for details.

More Information

PARAT IEH

Electrode Boiler
pdf



Meet us: All-Energy 15. - 16. May 2024 in Glasgow, Scotland
Meet us: Energia 22. - 24. October 2024 in Tampere, Finland

News

Go to news archive